Look up
Vocabulary
Every closed set Flow reads, generated from the graph package in the build that published this page.
Values are written exactly as the wire spells them. The same sets are available as data at /docs/vocabulary.json.
Statuses
What holds the work, as somebody asserted it. A move outside "Moves to" answers 409 invalid_transition with from,to and allowed. Writing the status a task already has is not a move. A calendar task always carries its date, a scheduled wait with until, or the write answers 400 calendar_requires_date. These are the two writes Flow refuses. A move into a status marked "cause" needs a basis, or the task is flaggedneeds_reconciliation.
| Status | Meaning | Moves to | Cause |
|---|---|---|---|
active | A current commitment with a concrete next action. The only status the ready set offers. | waiting, calendar, blocked, incubated, completed, cancelled, discarded | yes |
waiting | Depends on a person or an external event, named in an external wait. | active, calendar, blocked, incubated, completed, cancelled, discarded | yes |
calendar | Needs attention on a date and not before, carried by a scheduled wait. | active, waiting, blocked, incubated, completed, cancelled, discarded | |
blocked | An identified impediment is in the way. Where it is another task, a blocks edge says so. | active, waiting, calendar, incubated, completed, cancelled, discarded | yes |
incubated | Not a commitment now. Reconsidered at review, monthly. | active, waiting, calendar, blocked, discarded | yes |
reference | Material worth keeping, with no action in it. Reviewed monthly. | archived | |
completed | Reached its outcome. | none (terminal) | yes |
cancelled | A real commitment, dropped. | none (terminal) | yes |
discarded | Never a commitment: created in error, a duplicate, or of no value. | none (terminal) | |
archived | Reference material put away. | none (terminal) |
Readiness
Derived on every read, never stored. Ordered by decreasing agency: something you do, something you chase, something you merely wait for.
| State | Meaning |
|---|---|
ready | Active, nothing open blocks it, and no wait holds it. Start it. |
blocked:dependency | Another task holds it. The graph clears it; nothing to chase. |
blocked:external | Someone outside holds it. Chase them. |
waiting:scheduled | A date holds it. It clears itself. |
Priorities
Asserted by a person, never inferred, and optional: most tasks carry none. It orders the ready set before leverage does, and sets nothing else: open work comes up for review a week after its last write or confirmation, whatever its priority.
| Level | Meaning |
|---|---|
very_high | The most important. Ranks first; a task with no priority ranks last. |
high | Ranks ahead of most of the ready set. |
medium | The ordinary level for something somebody did rule on. |
low | Below the ordinary. |
very_low | Worth keeping, least likely to be picked. |
Link kinds
Directed, typed edges between two tasks. Only blocks gates readiness.
| Kind | Meaning |
|---|---|
blocks | The source must be done before the target can start. The only kind that gates readiness. |
depends_on | Kept for writers that still use it: the same direction as blocks, gating nothing (from: A, to: B says B depends on A). Prefer mentions. |
derived_from | The source’s interpretation traces back to the target. |
decides | The source is the choice the target records. |
justifies | The source is the reason the target holds. A basis is carried by this kind and decides. |
supersedes | The source replaces the target as the current statement of the same role. |
retracts | The source withdraws the target without deleting it. |
implements | The source carries out the target. |
mentions | A plain cross-reference. Confers no support. |
Wait kinds
What holds a task that no other task blocks.
| Kind | Meaning |
|---|---|
scheduled | A date. Clears itself when the date arrives. |
external | A person or event outside your control, named in the reason. May never clear; chase it. |
Record kinds
What a task is, as opposed to where its work has got to. The status table governs commitment and project.
| Kind | Meaning | A valid change |
|---|---|---|
evidence | A fact about the world: observed, measured or read in a source. Never the words that approved a change: those are its basis. | add context, a restriction, or a retraction; never rewritten |
decision | A choice and its reasons, including standing rules for agents. | kept historical; a new decision supersedes it to change direction |
commitment | Work somebody holds. The default kind of task. | a valid, justified GTD transition when relevant |
project | An outcome that needs more than one action. Carries no work; its steps block it. | changed by decision, review, completion, or cancellation |
Reference roles
What an external reference is to the task.
| Role | Meaning |
|---|---|
source | Where the task came from. |
spec | What the task has to satisfy. |
implements | The work that carries the task out, such as a pull request. |
context | Anything else worth reading alongside it. |